The ontology becomes concrete when one engineering concern is followed from clinical intent to evidence. This infusion-pump lockout thread is small enough to read in a minute and complete enough to show how the layers connect.

The scenario in plain language

A patient presses the dose button for pain relief. The pump may deliver one extra dose — a bolus — but only if the lockout timer says enough time has passed. Otherwise the pump must block the dose, to prevent overdose.

That is the whole clinical situation. Everything below is that sentence, recorded as typed model elements.

The thread

Step Element What it holds
Use case / need needSafeTherapy The clinical intent: patient-controlled therapy stays safe in normal use and in fault handling
Requirement reqLockout A typed obligation derived from the safety scenario, carrying its class and its source
Architecture infusionMgr The software item responsible for implementing it
Behavior lockout prevents bolus The mode and guard that must hold when the scenario executes
Risk control prevent overdose during lockout The ISO 14971 control that reduces the hazardous situation
Verification vcLockout The case and acceptance criteria that check the control under this scenario
Evidence evidenceLockout The test result, tied to the reviewed baseline
Document view rmfView The generated risk-management view produced from the same thread

Each step is a typed element, and each arrow between them is a typed relationship carrying a status and the meaning between its two ends.

The same thread with real identifiers

In the GPCA model the thread is populated and addressable:

HZ-001    Overdose            drug delivery error · catastrophic
  ↓
REQ-025   Ignore bolus        SW requirement · source = risk
  ↓
SW-005    Infusion_Manager    responsible · Class C
  ↓
RC-001    Lockout             inherent safe design
  ↓
VER-002   Verify lockout      test · acceptance criteria
  ↓
EVD-001   Lockout evidence    tied to baseline

Each row of a traceability table becomes an object you can inspect and query. The risk management file view, the V&V matrix, and change-impact analysis all read this one thread rather than maintaining three parallel copies of it.

Note what REQ-025 carries: source = risk. The requirement records why it exists as typed data. That is the difference between a matrix that says HZ-001 → REQ-025 and a model that can answer "which requirements exist only because of a hazard, and would need re-review if that hazard's severity changed?"

Compiling the argument

We compile code. We should be able to compile the safety argument.

Because the elements and links are typed, review questions become executable checks. Running the rules over an incomplete model produces this:

$ memo validate

CR-MED-001  Hazard must have ≥1 risk control              (ISO 14971)
            Missing mitigation: hazAirInLine

CR-MED-003  Risk control must be verified                 (ISO 14971 §7.4)
            Missing verification: rcDoorOpenAlarm

CR-MED-004  Pre-mitigation risk must be assessed
            against a risk matrix                         (ISO 14971)

Result: 2 errors · 1 warning · thread HZ-001 closed

Four things follow from that output:

  • Gaps surface early enough for correction ahead of design review or audit.
  • Closure is visible to software, systems, risk, and V&V at the same time, from the same run.
  • The rules run in CI, before merge or release — compliance becomes a build step.
  • Each change produces a defined set of elements to re-check.

What validation establishes

Validation establishes structural completeness against the encoded rules and makes review gaps visible to engineering, safety, and V&V. Qualified people retain responsibility for clinical judgement, risk acceptance, and approval decisions.

Why this thread works

The thread holds together because every step is typed and every link states what it claims. Change the lockout interval and the model can tell you that REQ-025 derives from HZ-001, that SW-005 is responsible, and that VER-002 must be re-run before EVD-001 is valid again.

That is the whole argument for MEMO, in one scenario.